Tabarak Towers Project:k1,k2,k3 Alkatamya (work is underway)

 

General contractor and consultant: Tabarak Group.

General contractor for the interfaces: Smart Company Group.

Project tasks:

 - Structure facades double glazing turnover and straight including facades windows.

 - Total area 650 metres flat.

 - Aluminum sliding doors on the main façade including to 350 meters flat of glazing.

 - Sliding windows on the back facades with single glass of 350 meters flat.

 - Doors and windows of the stairs, kitchens and bathrooms glass 250 meters flat.